Map the auxiliary circuits
Separate the controller I/O, temperature sensors and pump status contacts on the wiring schedule. Identify each field cable and its destination before laying out the terminal row.
Plan service access
Record which connections technicians must isolate or unplug when a pump or sensor is replaced. Share the drawing and conductor schedule so the proposed terminals can be checked for that circuit.
